New Church and School Facility. Approx. 27,000 sf. on the main floor with a balcony for future expansion. The building Hvac system is geothermal for maximum savings over the life of the building.
This building received Behlen Building of the Year in the Religious and Overall Categories. It also was featured in 2 national magazines.
Metal Mag May.June 2007 Metal Construction News July 2007
Key Building Information:
| Location | Columbus, Nebraska |
| Design Team | Bierman Contracting, Inc, Toby Gay and Associates, Steve Zach, and Mike Hasenkamp |
| Structure | Metal Building, Structural Steel and Masonry |
| Building Size | Approx. 27,000 square feet |
| Building Use | Sanctuary and classrooms |